1 June 7, 1960 Construction permit CPRR-55 authorizing the Regents of the University of Wisconsin to construct a 10kW (thermal) pool type nuclear reactor issued by the United State Atomic Energy Commission.
2 November 23, 1960 License R-74 authorizing the Regents of the University of Wisconsin to possess and operate a 10kW (thermal) pool type nuclear reactor issued by the United State Atomic Energy Commission.
3 January 16, 1961 Initial criticality achieved at 9:10 PM with GE MTR flat plate fuel.
4 March 26, 1961 Initial criticality achieved on the first operational core.
5 December 7, 1964 Reactor power increased to 250kW (thermal).
6 November 14, 1967 Conversion to General Atomic TRIGA fuel with pulsing capabilities and an increase in reactor power to 1000kW (thermal).
7 June 15, 1979 Completed conversion to General Atomics FLIP TRIGA HEU fuel.
8 September 16, 2009 Initial criticality achieved at 2:23PM with General Atomics 30/20 TRIGA LEU fuel.
9 March 25, 2011 Renewed facility license R-74 issued by the United States Nuclear Regulatory Commission.